---
title: "New Home Low-Voltage Prewire Checklist | Systems of Nevada"
url: "https://systemsofnevada.com/guides/new-home-low-voltage-prewire-checklist/"
canonical: "https://systemsofnevada.com/guides/new-home-low-voltage-prewire-checklist/"
updated: "2026-11-21"
breadcrumb: "Home > Guides > New home low-voltage prewire checklist"
business: "Systems of Nevada, Inc."
what: "residential and commercial security systems, 24-7-365 central station monitoring, fire alarm systems, security cameras, video surveillance, access control, intercoms, home automation, audio and video, flat panel TV installation, structured cabling, central vacuum systems (low-voltage)"
phone: "775-355-0831"
email: "steve@sysnv.com"
address: "1220 E. Greg Street, Suite #4, Sparks, NV 89431"
hours: "Mon-Fri 8:00 am-4:30 pm; closed Sat-Sun"
since: "1989"
licenses: "Nevada State Contractors Board 0042143 (C-2c fire detection, C-2d low voltage) and 0039080 (central vacuum); Nevada State Fire Marshal F 486"
consultations: "free, on-site"
---

# New Home Low-Voltage Prewire Checklist

Home technology · 6 min read · Updated November 2026

Prewire before drywall: network cable to every room, a central wiring hub, and runs for cameras, security, audio, TV and, if you want it, central vacuum tubing. Adding any of these after the walls close costs more effort than running them when the studs are open.

Key points

- Run the cable while framing is open, before insulation and drywall.
- Pick a wiring hub location first; every run ends there.
- Plan more data drops than you think you need.
- Include exterior spots for cameras, a doorbell and outdoor audio.
- Central vacuum tubing is easiest to place in new construction.

There is a short window in every new house when the walls are open and cable runs are easy. After insulation and drywall, the same run means fishing through finished walls. This checklist goes room by room so you can talk to your builder with a list in hand.

## Start with the hub

Every prewire plan ends at one spot: a closet or equipment room where cables meet, network gear sits and power is available. Choose it early and make it large enough for a rack or a wall-mounted panel. Our [telecom rooms and racks](https://systemsofnevada.com/structured-cabling/telecom-rooms-racks/) page describes this hub in detail.

Keep the hub central if you can, and keep it out of a hot attic or a spot that cannot be reached without a ladder. The cabling standard limits a channel to 100 meters, made up of a 90 meter permanent link plus patch cords, so the hub location also decides how far your longest run can be. That figure comes from the TIA-568 family, summarized by [CommScope](https://www.commscope.com/cat-6a/).

## Room-by-room list

Use this as a starting point and cross out what you do not need. We can adjust it to your plans during a [free on-site consultation](https://systemsofnevada.com/free-consultation/).

| Area | Plan for |
|---|---|
| Living room or great room | Data drops, TV location cable, speaker wire, room for a hidden equipment shelf |
| Kitchen | Speaker wire, a data drop, a spot for a tablet or control keypad |
| Primary bedroom | Data drop, TV cable, speaker wire |
| Other bedrooms | One or two data drops each |
| Office | Several data drops, a spot for a router or wireless access point |
| Garage | Data drop, camera run, door keypad location |
| Exterior | Cameras at the entries and the driveway, doorbell, outdoor speakers |
| Ceiling spots | Wireless access points, ceiling speakers, smoke and heat detection planning |

## Security, cameras and doors

Decide on door and window contacts, motion detector spots and the keypad location before walls close, because those runs are much easier now. Cameras need cable at every location where you may want one, and a spare run at each corner is low-cost insurance against changing your mind.

Our [home alarm systems](https://systemsofnevada.com/residential-commercial-security-systems/home-alarm-systems/) and [home security cameras](https://systemsofnevada.com/security-camera-installation/home-security-cameras/) pages show what typically goes where.

## Audio, theater and lighting control

Speaker wire to the rooms where you may want sound, a clear path to the TV, and wall boxes sized for lighting control keypads are all small items now and big items later. If a home theater or whole-house audio is in the plan, the notes in [planning whole-home audio](https://systemsofnevada.com/guides/whole-home-audio-planning/) go deeper.

We coordinate our cable plan with your builder and the other trades, so the walls are ready for every system we will install later.

## Central vacuum

If a central vacuum is on your list, the tubing is run through walls and framing, which is why new construction is the easy time. We hold Nevada State Contractors Board license 0039080 for central vacuum systems. Read more on [central vacuum for new construction](https://systemsofnevada.com/central-vacuum-systems/new-construction/).

## Before the drywall crew arrives

- Confirm the hub location and its size with the builder.
- Walk the framed house with a marked-up plan and match each drop to a wall.
- Check that each run is labeled at both ends.
- Ask for a photo of every wall before it is covered.
- Test and document the runs before insulation if your schedule allows.

Builders can find more on our page for [custom home builders](https://systemsofnevada.com/industries/custom-home-builders/).

### Sources (4)

- commscope.com : [commscope.com/cat-6a/](https://www.commscope.com/cat-6a/) (checked November 2026)
- law.cornell.edu : [law.cornell.edu/regulations/nevada/NAC-624-200](https://www.law.cornell.edu/regulations/nevada/NAC-624-200) (checked November 2026)
- Nevada State Contractors Board : [app.nvcontractorsboard.com/Clients/NVSCB/Public/ContractorLicenseSearch/ContractorLicenseS](https://app.nvcontractorsboard.com/Clients/NVSCB/Public/ContractorLicenseSearch/ContractorLicenseSearch.aspx) (checked November 2026)
- Wikipedia : [en.wikipedia.org/wiki/Category_6_cable](https://en.wikipedia.org/wiki/Category_6_cable) (checked November 2026)

## Related questions

### When should prewire be done in a new build?

After framing and before insulation and drywall. That is when running cable is quickest and least disruptive.

### How many network drops should each room have?

There is no single number, and needs differ by room. A home office usually wants several, while a bedroom may need one or two.

### Do I need cable if I plan to use WiFi?

Yes. Wireless access points and many cameras still need a cable back to the hub, and wired connections are steadier for TVs and desktops.

### Is Cat6 or Cat6A better for a new house?

Cat6A carries 10 gigabit to the full 100 meters, while Cat6 is rated for 10 gigabit only over a shorter run, about 37 to 55 meters depending on conditions. Our Cat6 vs Cat6A guide has the details.

### Can you work with my builder's schedule?

We coordinate with builders around framing and drywall so runs are done at the right point.

[More questions and answers](https://systemsofnevada.com/faq/)
